Plunge Series · Portsea · Mornington Peninsula
6.2m Plunge Pool with Self-Cleaning, Quartz, Portsea VIC
Installed the same time as the house and sealed under an OH&S-compliant engineered lid for months while the build continued around it. A masterclass in sleeper-pool strategy on a large peninsula block where every access pathway had to be protected from day one.
Pool
Plunge 6.2 × 3.4m
Colour
Quartz
Install
Sleeper, engineered lid
Cleaning
Self-cleaning
The Build
Inside the install
Nine angles — from the early-stage sealed lid through to the finished pool with paving and final fencing in place.
The Project
A sleeper pool on a Portsea build — access strategy as the design driver
The pool was built at the same time as the house. With access set to become restricted as the build progressed, the pool had to be installed early — fully completed, then sealed under an OH&S-compliant engineered lid locked onto the concrete beam. The lid stayed in place for months. When it came off, the equipment went in, the paving was finished, the final fence went up, and the family moved into a pool that had been waiting for them since day one.
Pool first, house around it
Pool installation completed early — before access tightened up.
On peninsula builds, access typically only gets harder as the house comes up. So the sequence was: install the pool fully, fill it, install the concrete edge beam, then seal it under a heavy-duty engineered lid. The pool became a paved-over footprint that builders walked across for months.
OH&S-compliant engineered lid
Locked to the concrete beam — safe for workers, safe for the pool.
This isn’t a tarp. The lid is engineered to OH&S standards, locked down onto the pool’s concrete edge beam, rated for foot traffic and material loading. The trades could work above it without risk to themselves or the pool shell underneath.
The large-block strategy
Start from the farthest point. Protect storm water and agi drains the access pathway will need.
On large blocks like Portsea ones, it’s tempting to build whatever’s closest to the road first. The smarter approach: start from the farthest point and work back. The access pathway you’re creating gets used by excavators, concrete trucks, equipment crews — and underneath that pathway are the storm water and agi drains you don’t want crushed. Sequence matters as much as design.
Waking it up
Lid off, equipment installed, temporary fence up, paving in, final fence in place, family moves in.
Several months before house handover, the lid came off. Equipment was installed; a temporary fence went up while paving was completed; the final pool fence was placed. The day the family arrived at their new house, the pool was ready to swim in.
At a Glance
Project specifications
Pool & design
- Shape
- Plunge 6.2 × 3.4m
- Colour
- Bi-luminite Quartz
- Install type
- Sleeper pool — built same time as house, OH&S lid installed
- Site type
- Large peninsula block, build-from-furthest-point strategy
- Location
- Portsea VIC (Mornington Peninsula)
Features & equipment
- Cleaning
- Vantage in-floor self-cleaning
- Circulation
- Vantage automated circulation
- Protection during build
- Engineered OH&S-compliant lid locked to concrete beam
- Use
- Year-round peninsula family use
Why Compass For New-Build Pools
Four reasons sleeper installs win on big blocks
On a large peninsula block, the cheapest mistake is leaving the pool to last. Access closes, sequencing breaks, retrofit costs blow out.
Pool-first sequencing
Install the pool when the site is open and excavators can move freely — not when the house is built and access has narrowed to a side gate. The biggest cost driver on retrofit pools disappears entirely.
OH&S engineered lid
Not a tarp — a proper engineered cover locked onto the concrete beam, rated for foot traffic and material loading during the rest of the build. Workers safe, shell protected, pool ready to wake up months later.
Vantage from move-in day one
When the family arrives at the new house, the pool is filled, equipment is running, in-floor cleaning is sweeping. No spring-of-next-year wait, no contractors trampling through the new house to commission a pool.
Large-block planning
Start from the farthest point. Protect storm water and agi drains under the access pathway. The kind of sequencing wisdom that comes from building hundreds of pools across the peninsula — not just one in your own backyard.
Mornington Peninsula build?
Portsea, Sorrento, Blairgowrie, Rye, Rosebud, Mt Eliza — we build right across the peninsula. Talk to us early so we can sleeper the pool into your timeline.